Projects in china

Wuhan Donghu High-tech Industrial Park route change project
Wuhan Donghu High-tech Industrial Park route change project. Due to the construction of the high-tech industrial park, high-pressure gas pipeline route change operation is required. To meet this demand, our company actively participates in the project route change project, ensuring the quality and quantity of the project, racing ahead of schedule, working overtime to meet the construction period, and delivering the goods in advance.

Henan Hebi Natural Gas Pipeline Project
Our company has provided L450M lsaw steel pipe for the laying of Hebi natural gas pipeline, which has improved the living conditions of residents, facilitated people’s lives and improved the urban environmental quality. Under our company’s efforts and coordination, the programme was completed well ahead of schedule.

The Haoji Railway diversion project
HaoJi railway ( MengHua railways) – China’s largest coal line, a class I electrified railway connecting Haolebaoji in Inner Mongolia and Ji’an in Jiangxi Province. Our company takes an active part in the diversion project of the project. With the advantages of high-quality service and long-term cooperation with steel mills, we actively communicate and coordinate to ensure that pipes are provided on schedule, so as to do our part to solve the problem of uneven resource distribution for the country.

External protection of FRP in EPC Project Department of Chaozhou Natural Gas high-pressure Pipeline
The project consists of one trunk and two branches, namely Chao ‘an Main Line, Tiepu branch line and Guxiang branch line. Chaoan main line starts from the first station of Dengtang and ends at Chaoan sub station. The line length is 52.1km and the pipe diameter is 610mm. The Tiepu branch line starts from Fuyang branch station and ends at Tiepu branch Station. The line length is 39.9km and the pipe diameter is 610mm. The branch line of Guxiang starts from NO. 1 valve chamber and ends at Guxiang sub-transmission station. The line length is 6.9km and the pipe diameter is 323.9mm. In order to adapt to the local terrain, it is necessary to add a layer of fiberglass outside the 3PE steel pipe. The construction period is urgent, and our company will actively cooperate to ensure the quality,quantity and the construction period.